PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Laying out block at the 1st floor Sally ports Facing West 1.jpg Laying out block at the 1st floor Sally ports Facing West.jpg Preping the Electrical Room slab Facing North-West.jpg Welded steel plate at 2nd floor column line E.jpg Metal furing the 2nd floor shear wall Elev. 5,6 Facing North.jpg Welded steel plate at 3rd floor column line E.jpg Welded steel plate at 4th floor column line E.jpg Installing Black iron duct work at the 4th floor Facing East.jpg
Previous pageNext page Metal furing the 2nd floor shear wall Elev. 5,6 Facing North
Metal furing the 2nd floor shear wall Elev. 5,6 Facing North